Difference between revisions of "South East Network"

From Bilbcraft Wiki
Jump to navigation Jump to search
(Update to cover Southeast Network up to 16/08/2020)
Line 29: Line 29:
 
\\\\BHF_violet~~[[Midlands Station|Midlands]]
 
\\\\BHF_violet~~[[Midlands Station|Midlands]]
 
}}
 
}}
The '''Purple Penguin Line''' is a branch line run by the Penguin family. It is coloured purple on the map. From West to East it stops at:
+
The '''Southeast Network''' is a line run by the [[Central Rail Authority]] (formerly the Dinbych Line, run by the Dinbych Council and Purple Penguin Line run by the Penguin family). It is coloured purple on the map. From West to East it stops at:
   
*[[Cosán Station|Cosán]] (''for [[Dinbych Line]]'')
+
*[[Ukraine Station|Ukraine]] (''for [[North-South Mainline]]'')
  +
*[[Dinbych Station|Dinbych]] (''for [[Pink Subway Line]]'')
  +
*[[Cosán Station|Cosán]]
 
*[[Fairy Station|Fairy]] (''for [[Fairy Village]] and Danni's Skeleton Farm'')
 
*[[Fairy Station|Fairy]] (''for [[Fairy Village]] and Danni's Skeleton Farm'')
 
*[[Jaguar Station|Jaguar]]
 
*[[Jaguar Station|Jaguar]]
 
*[[Gentoo Station|Gentoo Interchange]] (''for [[East-West Mainline]] and Elytra hub'')
 
*[[Gentoo Station|Gentoo Interchange]] (''for [[East-West Mainline]] and Elytra hub'')
  +
*[[Locke Station|Locke]]
  +
*[[Birch Fields Station|Birch Fields]]
  +
*[[Bogwatch Station|Bogwatch]]
  +
*[[Quarry Station|Quarry]]
  +
*[[Kemet Station|Kemet]]
  +
*[[Midlands Station|Midlands]]
   
There is access to the [[East-West Mainline]] from Gentoo. Work is (as of 27th May 2020) in progress to extend the Purple Penguin Line a further 5000 blocks to the East.
+
There is access to the [[East-West Mainline]] from Gentoo. Work is (as of 27th May 2020) in progress to extend the Southeast Network a further 5000 blocks to the East.
   
A full loop of the current Purple Penguin Line takes about 4.5 minutes. When running correctly, trains stop every 1.5 minutes. If not running, contact Izzy or Dannilion on Discord.
+
A full loop of the current Southeast Network takes about 4.5 minutes. When running correctly, trains stop every 1.5 minutes. If not running, contact Izzy or Dannilion on Discord.
   
 
The line is heavily decorated, especially the tunnel between Fairy and Gentoo which includes two aquariums and many flags.
 
The line is heavily decorated, especially the tunnel between Fairy and Gentoo which includes two aquariums and many flags.

Revision as of 08:49, 16 August 2020

Purple Penguin Mainline
Ukraine
Dinbych
Cosán
Fairy
Jaguar
Gentoo
East-West
Mainline
Locke
Birch Feilds
Bogwatch
Quarry
Kemet
Midlands

The Southeast Network is a line run by the Central Rail Authority (formerly the Dinbych Line, run by the Dinbych Council and Purple Penguin Line run by the Penguin family). It is coloured purple on the map. From West to East it stops at:

There is access to the East-West Mainline from Gentoo. Work is (as of 27th May 2020) in progress to extend the Southeast Network a further 5000 blocks to the East.

A full loop of the current Southeast Network takes about 4.5 minutes. When running correctly, trains stop every 1.5 minutes. If not running, contact Izzy or Dannilion on Discord.

The line is heavily decorated, especially the tunnel between Fairy and Gentoo which includes two aquariums and many flags.